July 27, 2015

Baralaba Water Treatment Plant

Waterform was contracted to design and build a 2MLD BarrierUF Ultrafiltration water treatment plant with the robust INGE Ultrafiltration membrane. Part of a water treatment plant treating river from the flood prone Dawson River in QLD, the plant was designed for
July 27, 2015

Murray Bridge Stormwater Recycling Plant

Waterform designed, built and commissioned a high rate Filtration & UV Disinfection plant to clean up to 252m3/HR of captured stormwater destined for Murray Bridge township sporting fields, public spaces and reserves. Rather than the brownish scene the greets visitors to Murray Bridge in summer, visitors and residents alike can now enjoy some welcome green spaces. This initiative to make use of available water resources will save millions of litres of tap water a year and drought proof public areas.